Professional PV string, MPPT, voltage, current, and design validation tool.
| Step | What to enter | Where | Units | Notes |
|---|---|---|---|---|
| 1 | Enter panel Voc, Vmp, Imp, Isc, power, and Voc temperature coefficient. | Panel Inputs | V, A, W, %/°C | Take all values from the panel datasheet. |
| 2 | Enter inverter voltage limits, MPPT count, inputs on each MPPT, and common MPPT current limits. | Inverter Inputs | V, A, count | Use the MPPT count first, then set inputs for each MPPT. Put 0 for unused MPPTs. |
| 3 | Optional: enter different current limits per MPPT and manual string allocation. | Advanced MPPT Setup | A, count, on/off | The app already corrects Voc for cold weather. |
| 4 | Enter lowest site temperature, STC temperature, and winter safety margin. | Environmental & Control | °C, % | Never exceed Safe max series panels. |
| 5 | Read minimum and safe maximum series count, then review configured DC power and final status. | Calculated Results + Status | panels, W, text | All checks should show PASS and final status VALID DESIGN. |
| Key formulas | Meaning |
|---|---|
| Valid strings / MPPT | Minimum of input ports, current limit by Imp, and short-circuit limit by Isc. |
| Configured allocation | Manual strings per MPPT when manual mode is ON, otherwise automatic sequential allocation. |
| Recommended valid setup | Best valid strings capped by total MPPT capability, then distributed across MPPT1:MPPT4. |
| Configured DC power | Configured total strings × panels/string × panel power. |